Generac 18kW with Wi-Fi and SE ATS and Load Shed

Manufacturer: 
Generac
Model Number: 
7226
Manufacturer Specs: 

This generator and ATS will be paired custom to provide whole house back up to a 100 or 200-amp service.
The generator will be model 7226 and the transfer switch will be model RTSW100A3 or RTSW200A3.
Manufacturer Specs

 

Transfer Switch: 

This generator and ATS will be paired custom to provide whole house back up to a 100 amp service.
The generator will be model 7226 and the transfer switch will be model RTSW100A3 or RTSW200A3.
Click here to download ATS manufacturer specs

Circuits Protected: 

Protects a whole existing 100 amp main electrical panel

Coverage Option: 
Managed Whole House, Complete Whole House
Category:

System Outputs

18,000 Watts (LP) 18,000 Watts (NG), 240/120 volt single phase, 80 amp 2P circuit breaker

Engine

GENERAC G-Force 800 Series 2 cylinder 816 cc

How Does it Work

How Does it All Work load center jpeg. Image of a generator brochure

Installation Process

JOB REVIEW
Our crew normally loads your generator and all related materials into a specially equipped installation vehicle early in the morning and arrives at your location at about 8 AM. Upon arrival, our Lead Technician will go through the entire installation, to make sure no details are left out.

GAS WORK
The generator is then unloaded and carefully positioned on top of a leveled crushed gravel base (or pre-cast concrete pad if chosen). The natural gas connection will be made either from the inside of the home, or it will come directly from the gas meter, as specified by your actual proposal installation details. The steel gas pipe is sized according to the fuel volume requirements of your generator and is sealed at all connection points and painted to help prevent corrosion.

ELECTRIC WORK
Inside, the Automatic Transfer Switch / Load Center is installed next to the existing main circuit breaker panel. The selected circuits are then relocated into the new Load Center, and both panels are re-labeled. The control wiring and power lines coming from the generator are then installed into the Transfer Switch, and all wiring and piping is completed to finalize the installation.

FINISHING TOUCHES
To complete the exterior installation, a ground rod is installed. The generator is equipped with a battery, and all fluids are checked, fuses installed, and connections are double-checked.

SYSTEM TEST
Once complete, the entire system is tested and the Serial #, Model #, Date of Installation, and all related startup information is cataloged. The system is now completely operational, and the exercise time is set so that the generator runs itself once a week for approximately 12 minutes to routinely check itself and keep all mechanical components lubricated and functioning well.

EDUCATION ON HOW SYSTEM WORKS
The generator manuals, keys, and related paperwork are given to the customer, and the system is explained and any last details are gone over.

Optional Items

GenX Optional Items flyer. Image of a flyer showcasing optional items and services offered by GenX when generator installation is purchased.

Warranty

Years one and two – Limited comprehensive coverage on mileage, labor, and parts.
Year three – Limited comprehensive on parts.
Years four and five – Limited comprehensive coverage on the engine (short block) and alternator (rotor and stator) parts only.

Click here for warranty details

Extended 5,7 or 10-year warranties are available.  See Optional Items for pricing

Product Video